Here are some pictures of our master bathroom. The first few are from two years ago when we first started thinking about renovating. The last few are of the work in progress.
BEFORE
Bathtub
Counter and door
Far wall
Work in Progress
Counter and door
Far wall
Work in Progress
Wall above the tub
Will and Hannah painting the far wall
The far wall with a sample of the paint
Door to bedroom
As you can see, we have come a long way but still have a long way to go. Mike and the kids finished the first coat of paint yesterday. Tonight, Mike is hoping to put on a second coat so we can start on the trim tomorrow. He would like to start laying the tile by the end of the week. He is going to tile half the wall behind the toilet and the far wall, along with the floor. The floor tile will be the same color and size as in the hall bathroom. The wall tile will be 6x6 in a lighter tan. The trim will be in white. We are hoping that the tile and trim, along with the beige counter top, toilet and tub will tone down the paint color.
No comments:
Post a Comment